This contract is to provide all labor, materials, equipment, and transportation necessary to repair the Cathodic Protection Systems at the regional Waste Water Treatment Plant (WWTP). Work includes repairs on all CP test stations. Repair cathodic protection for all ductile iron pipe between the west valve risers and the entrance road as well as the inlet/outlet piping from the North and South digesters and install CP Bond Test Boxes. Replace cathodic protection for the North and South clarifiers, as well as the North digester. Upgrade fire protection piping to ensure proper isolation and install additional galvanic anodes as necessary to satisfy established cathodic protection criteria.
Client:
45th Contracting Squadron, Patrick Air Force Base
Location:
Cape Canaveral, Patrick Air Force Base, Florida
Gideon Contracting was awarded this task order under the Naval Air Station – Corpus Christi Job Order Contract. The scope of this project was to demolish containment pits, replace dispensers, install fuel pump, reroute fuel piping at DLA Fueling Station, switch Mogas and TXU fuel storage tanks, Replace Mogas fuel dispensers, reroute all piping/conduit outside of existing pits, demolish 2 old containment pits, install explosion proof pump, meter and piping for new 4000 gallon tank.
Client:
Defense Logistics Agency
Location:
Naval Air Station, Corpus Christi
Gideon Contracting was selected to provide a new raised walkway and stairs assembly at a fueling station at NAS CC. Gideon first demolished the existing light poles and other vertical obstructions at the truck fueling station. We then erected a 60’ by 54’ steel canopy with an internal height of 20’ over the existing truck fueling station. Gideon also erected a 36’ by 18’ with 10’ internal height steel canopy over the fueling equipment area. Both canopies were made to withstand wind load of at least 130mph, ground snow of at least 10 psf and a live load of at least 20psf. Both canopies were also built with galvanized corrosion resistant material, and explosion proof switches and auto-off daylight Sensor switch.
Client:
Defense Logistics Agency
Location:
Naval Air Station, Corpus Christi
Gideon removed the existing vertical tank and installed a new 6,000 gallon skid-mounted Convault tank system on the airfield.
Client:
Air Force
Location:
Dobbins AFB, GA
Gideon provided labor, materials, and equipment necessary to perform emergent electrical repairs on 18 Fuel Hydrants and Systems at Lajes Field, Azores, Portugal.