MENU

Sheppard AFB Taxiways

Sheppard Taxiways was a Firm Fixed Price task order successfully completed under Gideon’s Sheppard AFB MACC. The project involved site work, civil, paving and grading with 4.5 miles of runway/taxiway shoulders on each side of the paved surface, for a total length of approximately 9 miles and a total excavated amount of approximately 36,400 cubic yards. Work was carried out on an active flight line with materials and scheduling challenges resulting from geographic location, takeoff and landing frequency, and routine base lockdowns/closures.

Client:
United States Air Force -Sheppard AFB 402nd Contracting Squadron
Location:
Sheppard Air Force Base, Wichita Falls, TX

NEWS