This project was part of the Joint Base San Antonio Job Order Contract. The TSA Lab building is part of a training compound for training Travel Security Administration canines. The lab had to imitate an airport arrival and departure terminal. Gideon self performed the build out of the lab area using our own crews to execute the project with the scope including installing new wall partitions, interior and exterior doors, canopies, ceilings, pocket doors, exhaust fans, carpet, vinyl tile, epoxy floor coating, all finishes, electrical switches and wiring.
Client:
Lackland Air Force Base
Location:
US Army Corps of Engineers, Fort Worth District